Users Manual Part 2

Appendix D Field Replaceable Units
ONECELL
®
Hardware Installation, Release 5.5 D-13
D
R
A
F
T
NOTE: Provision the remaining Device configurations to align with the failed BC
configuration on the DMS Device Configuration page.
5 Scroll to the bottom of the page to view the Device PnP status.
If all of the PnP boxes have green checks, the BC replacement is successful. Stop
here.
If one or more of the PnP boxes are red, those activities failed. Go to the Device
PnP page to identify the failed activity.
Replacing Radio Points prerequisites and on-site activities
Prepare the network for the Radio Point replacement.
Prerequisites
On-site activities
Prerequisites
The following table contains a checklist of prerequisites for replacing an RP.
Prerequisite
SSH password
Replacement ONECELL RP module