Overview
This document describes the ONECELL installation and includes:
Chapter 3, Baseband Controller installation
Chapter 4, RP5100i installation
Chapter 5, RP5100r installation
Chapter 6, RP2000 Installation
Chapter 7, RP2100 Installation
Before installing the ONECELL components
Before installing the ONECELL components, the system integrator must plan the
network for the topology that will be deployed. See OneCell Network Planning Guide
(913023).
CommScope recommends that cables and switches be in place before installing the
ONECELL components. See Appendix E, Cable installation and power separation
guidelines for more information.
Commissioning the ONECELL network
To bring your ONECELL system up, you’ll need to commission the system by
configuring it. The commissioning procedures are dependent on the site installation.
Contact your CommScope representative for your commissioning procedures.