Users Manual Part 2

Appendix D Field Replaceable Units
ONECELL
®
Hardware Installation, Release 5.5 D-69
D
R
A
F
T
6 Verify the RP installation. See The operational state of the RP can be determined
by the LED status on the RP. Additional information can be attained from the
WebGUI status screens.
For verification procedures, see RP post-replacement verification.
Replacing a vertical pole mounted Rugged RP
1 Disconnect the Ethernet cable and the antenna couplers from the RP.