Specifications

Appendix E Cable installation and power separation guidelines
E-8 913035 4.0.04 June 2019
DR
AFT
5 Fill all space inside the tubing with B-sealant and position the filled tube to
overlap the end of the inner jacket and seal the gel.
6 Fold the drain wire and foil back over the tube and position the foil to be folded
back over the tube.