Installation Guide
Table Of Contents
- Table of Contents
- Document Overview
- Era System Overview
- CAP M Overview
- Safely Working with Era Hardware
- Installing CAP Ms
- CAP M Installation and Cascade Rules
- Cat6A Cable Requirements for Ethernet Devices
- Prepare for Installation
- Wire an Optional Hybrid Fiber Splice Box
- Mount the CAP M
- Grounding the CAP M
- Connect the CAP M Cables
- Power the CAP M
- Contacting CommScope
- CMS Global Technical Support
- Waste Electrical and Electronic Equipment Recycling
- Hardware to Software Mapping Information
- CMS Technical Training
- Accessing Era User Documentation
CommScope Era
™
Medium Power Carrier Access Point Installation Guide M0201AJE_uc
Page 42 © February 2020 CommScope, Inc.
Installing CAP Ms
17 On lower right of the CAP M-2, reinstall the M6x12 screw and its washers that you removed in Step 13 on
page 40.
a Slide first the M6 split-lock
washer and then the M6 plain washer over the M6x12 screw.
b Insert the
M6x12 screw through the screw hole shown below, and screw it back into the CAP M
chassis; torque to 11 N-m.
M6x12 screw and
washer set in hole
furthest from the
mounng surface
18 Repeat Step 11 on the left side of CAP M-2.
19 D
o one of the following:
• If t
his installation requires a Hybrid Fiber Splice Box, go to "Attach a Hybrid Fiber Splice Box to the
CAP M” on page 46.
• If th
is installation does not a Hybrid Fiber Splice Box, go to "Grounding the CAP M” on page 50.