Installation Guide
Table Of Contents
- Table of Contents
- Document Overview
- Era System Overview
- CAP M Overview
- Safely Working with Era Hardware
- Installing CAP Ms
- CAP M Installation and Cascade Rules
- Cat6A Cable Requirements for Ethernet Devices
- Prepare for Installation
- Wire an Optional Hybrid Fiber Splice Box
- Mount the CAP M
- Grounding the CAP M
- Connect the CAP M Cables
- Power the CAP M
- Contacting CommScope
- CMS Global Technical Support
- Waste Electrical and Electronic Equipment Recycling
- Hardware to Software Mapping Information
- CMS Technical Training
- Accessing Era User Documentation
M0201AJE_uc CommScope Era
™
Medium Power Carrier Access Point Installation Guide
© February 2020 CommScope, Inc. Page 47
Installing CAP Ms
2 Remove the six neck screws (shown below) from the front cover of the Splice Box.
3 Open the Splice Box.
4 At
tach an M4 x 25 pan-head screw to the upper hole, and a second M4 x 25 pan-head to the hole on the
lower, right-hand side of the Splice Box.
5 Close the Splice Box.
6 Rep
lace the six neck screws that you removed from the front cover of the Splice Box in Step 2 on page 47.
7 Go to "Grounding the CAP M” on page 50.