Installation Guide

Table Of Contents
M0201AJE_uc CommScope Era
Medium Power Carrier Access Point Installation Guide
© February 2020 CommScope, Inc. Page 47
Installing CAP Ms
2 Remove the six neck screws (shown below) from the front cover of the Splice Box.
3 Open the Splice Box.
4 At
tach an M4 x 25 pan-head screw to the upper hole, and a second M4 x 25 pan-head to the hole on the
lower, right-hand side of the Splice Box.
5 Close the Splice Box.
6 Rep
lace the six neck screws that you removed from the front cover of the Splice Box in Step 2 on page 47.
7 Go to "Grounding the CAP M” on page 50.