Users Manual Part 2

Appendix D Field Replaceable Units
OneCell
®
Installation, RP5000 series, Release 4.0 D-13
DR
AFT
NOTE: Provision the remaining Device configurations to align with the failed BC
configuration on the DMS Device Configuration page.
5 Scrol
l to the bottom of the page to view the Device PnP status.
If all of the PnP boxes have green checks, the BC replacement is successful. Stop
he
re.
If one or more of the PnP boxes are red, those
activities failed. Go to the Device
PnP page to identify the failed activity.
Replacing Radio Points
The following procedures provide instructions for replacing a OneCell Radio Point
(RP) module in a live network environment.
Prerequisites
On-site activities
Replacing a ceiling RP5100i (above tile)
Replacing a flown mounted RP5100i
Replacing a pole mounted Indoor RP
RP post-replacement verification
Prerequisites
The following table contains a checklist of prerequis
ites for replacing an RP.