Users Manual Part 2

Appendix D Field Replaceable Units
D-46 M0300A2 4.0.11 January 2020
DR
AFT
7 Replace the cover on the RP.
8 Verify the RP installation. The operational state of the RP can be determined by
the LED status on the RP. Additional information can be attained from the
WebGUI status screens.
For verification procedures, see RP post-replacement verification.
RP post-replacement verification
On-site
The operational state of the replaced RP can be determined by the LED status on the
RP. Additional information can be attained from the WebGUI status screens.
1 Connect the
Ethernet cable to the MGMT port on the BC’s front panel.