Users Manual Part 1
Chapter 2 Preparing to install the OneCell system
2-2 M0300A2 4.0.11 January 2020
D
R
A
F
T
Overview
This document describes the OneCell installation and includes:
• Chapter 3, Baseband Controller installation
• Chapter 4, RP5100i installation
• Chapter 5, RP5100r installation
Before installing the OneCell components
Before installing the OneCell components, the system integrator must plan the
network for the topology that will be deployed. See OneCell
®
Network Planning
Guide (M0300A1).
CommScope recommends that cables and switches be in place before installing the
OneCell components. See
Appendix E, Cable installation and power separation
guidelines for more information.