Users Manual Part 1

Chapter 2 Preparing to install the OneCell system
2-2 M0300A2 4.0.11 January 2020
D
R
A
F
T
Overview
This document describes the OneCell installation and includes:
Chapter 3, Baseband Controller installation
Chapter 4, RP5100i installation
Chapter 5, RP5100r installation
Before installing the OneCell components
Before installing the OneCell components, the system integrator must plan the
network for the topology that will be deployed. See OneCell
®
Network Planning
Guide (M0300A1).
CommScope recommends that cables and switches be in place before installing the
OneCell components. See
Appendix E, Cable installation and power separation
guidelines for more information.