Instruction manual

7
Regulation
7.1. Preparing the coffee grinder
Place the hopper (2) on the grind regulator (6) and check that the
shutter (4) is closed, as in Fig 1.
Fig. 2
Fig. 1
Anchor the hopper by threading the hopper safety screw with
help of a flat-head screwdriver and finally adjusting the setting
roller (5) by hand. Fig. 2.
Remove the hopper lid (1), fill the hopper (2) with coffee and
replace hopper lid. Fig. 3.
6.3. Putting the grinder into place
The grinder should be installed on a smooth flat surface. In order
to guarantee the optimum performance of the appliance, the
minimum dimensions of the work place should be as follows:
K-6 / K-6 Sil / K-6 Pro / K-8 Sil
K-10 Conic 31.5 / 800 12.1 / 310 16 / 400
K-10 Conic WBC
Height (in / mm.) Width (in / mm.) Depth (in / mm.)
6.4. Installation of the coffee grinder
Before connecting the coffee grinder, check the following:
That the data on the features label coincides with those of the
power supply.
That the electrical current is appropriate for the machine.
• That the connection point to the power supply network is
protected with appropriate fuses.
That the equipment is properly connected to a grounded so-
cket in accordance with the applicable safety guidelines.
*The coffee grinder should be used in areas with a room
temperature below 25/30ºC ( 77/86ºF ) and should not be
installed in places (SUCH AS INDUSTRIAL KITCHENS) where
cleaning with water jets is used.
i
i
i