Technical data

3–17
Compaq HSZ80 Array Controller ACS Version 8.3 Maintenance and Service Guide
Upgrading to a Dual-Redundant Controller
Configuration
Use the following steps to upgrade a single-configuration subsystem to a dual-
redundant configuration subsystem. To replace failed components, see Chapter 2,
“Replacement Procedures,” for more information. Before you complete this
procedure, you’ll need the following items:
Controller with the same software version and patch level that’s installed on the
subsystem’s current single controller
Cache module with the same memory configuration that’s installed in the current
cache module
ECB storage building block (SBB) for a dual-redundant configuration
ECB cable
Installing a New Controller, Cache Module, and
ECB
Use the following steps to install a new controller, cache module and ECB:
1. Connect a PC or terminal to the controller’s maintenance port. The controller to
which you’re connected is “this controller”; the controller that you’re installing is
the “other controller.”
2. Start FRUTIL with the following command:
RUN FRUTIL
FRUTIL displays the following:
Do you intend to replace this controller’s cache battery? Y/N