Technical data

3–6
Upgrading the Subsystem
7. Enter option 1, Enter Code LOAD local program, from the CLCP Main menu to
start the Code LOAD local program. CLCP displays the following:
You have selected the Code Load Utility. This utility is used to load
a new software image into the program card currently inserted in the
controller.
Type ^Y or ^C (then RETURN) at any time to abort code load.
The code image may be loaded using SCSI Write Buffer commands through
the SCSI Host Port, or using KERMIT through the maintenance terminal
port.
0: Exit
1: Use the SCSI Host Port
2: Use the Maintenance Terminal Port
Enter option number (0..2) [0] ?
NOTE: You can use either the SCSI host port (if your operating sysem supports it) or
the maintenance port. To use the SCSI host port, go to step 8. To use the
maintenance port, go to step 10.
8. Enter option 1, Use the SCSI Host Port, from the menu. CLCP displays the
following:
WARNING: proceeding with Controller Code Load will overwrite
the current Controller code image with a new image.
Do you want to continue (y/n) [n]: ?
9. Enter Y(es) and the download starts. When the download is complete, CLCP
writes the new image to the program card and restarts the controller. This process
takes one to three minutes. Go to step 15.