Specifications
Removal and replacement procedures 71
Figure 45 Installing the Heat Sink Assembly
CAUTION: When installing two heat sinks, please keep the label on heat sink towards the T mark
guide orientation on the system board.
CAUTION: For proper cooling, do not operate the server without the top cover, air baffle,
expansion slot covers, or blanks installed. For additional information, see the user guide. If hot-plug
components are supported, minimize the amount of time the top cover is removed.
To install the air baffle:
1. Connect all necessary cables.
2. Gently place the air baffle on the system board.
Figure 46 Installing the Air Baffle










