User guide

Hardware Installation
Compaq Server Console Switch User Guide 2-15
COMPAQ CONFIDENTIAL
Writer: Amy L. Laffitte File Name: c-ch2 Hardware Installation
Codename: Hoosier Part Number: 141555-03 Last Saved On: 8/26/02 3:33 PM
10. Position the front cover panel and secure it to the front of the rack, using one
screw on each side.
Figure 2-19: Positioning the front cover panel
NOTE: This installation supports the optional Switch Box Connector Kit, which provides frontal
access to a 4- or 8-Port switch for a keyboard, monitor, mouse, and power cord. If desired, use
this option in place of the front cover panel.
Completing the Installation
After your Server Console Switch is installed in the rack using one of the methods
listed in this chapter, proceed to Chapter 3, “Cabling.”