User's Manual

32
2) Wired system
2) Wired System Installation
A. Attach the battery to the detector.
B. Connect DC main connector(BT-MC04) to the Control Box(BT-CB02).
C. Connect Switching adapter(MPU51-105) to the Control Box(BT-CB02).
D. Connect the control box Ethernet cable(BT-EC02) to the workstation.
E. Connect the AC Power Supply Cord(BT-SC01) to the Switching adapter(MPU51-105).
F. Turn on the Control Box(BT-CB02).
G. Power on the Detector.
When using a trigger cable, connect the sync cable(BT-TC03) in between the generator and the control box(BT-CB02).
Charger connection
A. Connect Switching adapter(MPU51-105) to the Charger.
B. Connect the AC Power Supply Cord(BT-SC01) to the Switching adapter(MPU51-105).