User's Manual

Table Of Contents
3.4.3 Load a Balance job from AMS Machinery Manager into
the analyzer
Prerequisites
Ensure the same connection type is set on the analyzer and in Data Transfer.
Procedure
1.
Use the appropriate cable to connect your analyzer to a computer where AMS
Machinery Manager is installed.
2. On the computer, open Data Transfer.
3. On the analyzer, press Home > F9 Balance > F12 Job Manager > F7 Connect For Transfer.
The analyzer connects to AMS Machinery Manager.
4. To load a job using AMS Machinery Manager:
a. Select the appropriate database in the Navigation - Data Transfer pane.
b. Drag and drop or copy and paste the desired job to the connected analyzer in the
Data Transfer tab.
The Data Transfer Notification pane displays the progress of the transfer.
5. To load a job using the analyzer:
a. Press F1 Set Storage Location to select internal memory or a SD memory card.
b. Press F7 Load Jobs.
c. Press F8 or F9 to select a database.
d. Press F10 or F11 to select an area within the database.
e. Press F4 Select Area.
f. Press F8 or F9 to select a job and press F1 Select.
g. Press F7 Load Jobs.
6. After the transfer completes, press the Back key to return to the Job Manager
screen.
3.4.4 Dump a job from the analyzer to AMS Machinery
Manager
You can transfer jobs created in the analyzer's programs to the AMS Machinery Manager
database.
Prerequisites
Ensure the same connection type is set on the analyzer and in Data Transfer.
Transfer files with CSI 2140
44
DRAFT