Product specifications

2–1
Chapter 2. INSTALLATION
2.1 Unpacking and Inspection
The UT-4500-A Series Upconverter and its Installation and Operation Manual are packaged and
shipped in a pre-formed, reusable cardboard carton containing foam spacing for maximum
shipping protection.
Inspect shipping containers for damage. If shipping containers are damaged, keep them until the
contents of the shipment have been carefully inspected and checked for normal operation.
CAUTION
Do not use any cutting tool that will extend more than 1” into the container
and cause damage to the converter.
Unpack and inspect the UT-4500-A Series Upconverter as follows:
Step Procedure
1
Cut the tape at the top of the carton indicated by OPEN THIS END.
2
Remove the cardboard/foam space covering the converter.
3
Remove the upconverter, manual, and power cord from the carton.
4
Save the packing material for storage or reshipment purposes.
5
Inspect the equipment for any possible damage incurred during shipment.
6
Check the equipment against the packing list to ensure the shipment is correct.
7
Refer to the next section (Section 2.2) for installation instructions.
CAUTION
The equipment contains parts and assemblies sensitive to damage by Electrostatic
Discharge (ESD). Use ESD precautionary procedures when touching, removing, or
inserting the up/downconverter modules.