User guide

Installation l 3-3
Installation (continued)
Vacuum Line Connections
The vacuum line from the loader connects to the central separating section tangen-
tial entry tube. The vacuum line to the pump connects to the 3-way vacuum break-
er valve which is installed in the center of the filter chamber.
3
Installation
Filter Chamber
Vacuum Breaker
Valve (Internal)
Collection Chamber
Floor Stand
To Other Loaders
Using Same Material
To Material Supply
NOTE: Vacuum pump shown above is 180º out of position.