User guide

Installation (continued)
Dust Return Line Connection
For the automatic unload/reload type dust collectors, a “Y” diverter tube is includ-
ed and should be installed as close as possible to the main material loader.
Horizontal positioning of the “Y” diverter tube is best. The dust return line is a 1.5
inches {38.1 mm} OD tubing and should be installed rigidly from the “Y” diverter
tube back to the bottom take-away section of the dust collector, where the connec-
tion should be made with a 2-3 ft {61-91 cm} section of flex hose.
3-4 l Installation
Filter Chamber
Reload Control
Air Vent Valve
Take-Away Tube
To Other Loaders
Using Same Material
To Material Supply
Loader
Vacuum Pump
Reducing Adapter
(If Required)
“Y” Diverter