User guide

230V 230V
Touch Screen
Load Cells
Valve
Position
3
Pulse
Valve
Standard
Valve
Pulse
Valve
Standard
Valve
Valve
Position
4
6
Connect the load cell cable, a DB25 connector. This will supply the volt-
age for the load cell and collect the weight signal.
7 Choose a location for the TrueBlend touch screen operator panel to
be remote mounted. Mount the TrueBlend touch screen panel. (See the
TrueBlend user guide for mounting instructions for the touch screen con-
trol.) Connect the touch screen to the DB25 connector on the
WSB/GB retrofit converter box.
3
Installation
Installation l 3-11
Connecting the WSB/GB Retrofit
converter box
(continued)
WARNING: Models GBM and WSBM micro blenders require a load
cell adapter to be placed between the existing load cell cable and
the load cell connection on the retrofit control before the control is
powered up. If the adapter is not in place and the unit is powered
up the WSB/GB retrofit box will be damaged. See the section entitled,
“Adding a Load Cell Adapter,in this section.
6
7
NOTE: This area of the control will only
be seen on WSB/GB retrofit con-
verter boxes that have been
ordered to be placed on a blender
that has pulsed valves.