Steam humidifier Condair CP2 1115657 EN 0210 Technical Documentation
Contents 1 1.1 1.2 Introduction To the very beginning Notes on the technical documentation 4 4 4 2 For your safety 5 3 3.1 3.2 3.3 3.4 3.5 Product Overview The various models Delivery Humidification system overview Steam humidifier construction Functional description 6 6 7 8 9 10 4 4.1 4.1.1 4.1.2 4.2 4.2.1 4.2.2 4.3 4.3.1 4.3.2 4.
1 Introduction 1.1 To the very beginning We thank you for having purchased a steam humidifier Condair CP2. The steam humidifier Condair CP2 incorporates the latest technical advances and meets all recognized safety standards. Nevertheless, improper use may result in danger to the user or third parties and/or impairment of material assets.
2 For your safety Intended use Steam humidifiers Condair CP2 are intended exclusively for direct or indirect room humidification within the specified operating conditions. Any other type of application, without the written consent of your Condair supplier, is considered as not conforming with the intended purpose. The manufacturer/supplier cannot be made liable for any damages resulting from improper use. The user bears full responsibility.
3 Product Overview 3.1 The various models Steam air humidifiers Condair CP2 are available in a variety of models with different heating voltages and steam capacities ranging from 1 kg/h up to 180 kg/h max.. Depending on the steam capacity a system consists of 1 to 4 basic units max.. Systems with multiple basic units are interconnected via a so-called BUS and are operated in Master/Slave mode. The following table provides an overview of the various models and their capacity ranges.
3.2 Delivery The delivery includes: – Steam humidifier Condair CP2 compl. (according to the model designation), equipped with the desired options. Note: Desired options (cleanable steam cylinder, module M, etc.) must be specified separately when ordering. Detailed information on this subject is found in chapter 4.2.
3.3 Humidification system overview Models N4 and H4 6 1 2 3 7 8 4 5 6 7 8 9 10 9 5 10 1 4 2 Steam humidifier (N4/H4) Electrical connection Water drainage Ø22 mm (accessory “DS22”) Filter valve (accessory “Z261”) Water supply (building side) Steam nozzle (accessory “W21”) Steam distribution pipe (accessory “41-..”) Steam hose (accessory “DS22”) Condensate hose (accessory “KS10”) Integrated fan unit (models N4 only) 3 Models H5…H8, F.. and G..
3.
3.5 Functional description The steam humidifier Condair CP2 is a pressureless steam generator designed for direct or indirect room humidification. The steam humidifier Condair CP2 utilizes electrode heating. It is intended for use with regular tap water or partially softened water. Steam generation 4 3 2 1 Any time steam is requested, the electrodes (2) are supplied with voltage via main contactor (1).
4 Basic planning All the data necessary for the selection and layout of a Condair CP2 humidifier system are provided in the following chapters. The following planning steps are required: 4.1 • Selecting the unit (see chapter 4.1) • Selecting options (see chapter 4.2) • Selecting accessories (see chapter 4.3) Selecting the unit The selection of the unit is reflected in the type description: Condair CP2 F30 1. Model version (heating voltage) 2. Required maximum steam capacity 4.1.
4.1.
4.2 Options 4.2.1 Options overview The following table presents an overview of all options which are available for the steam humidifier Condair CP2. N4 H4 Model Condair CP2 Cleanable steam cylinder (see details in chapter 4.2.2) number F9...F15 G9...G15 – – D3.. D4.. – – 1 1 Module M.. (see details in chapter 4.2.2) F16...F45 G16...
4.2.2 Option details Steam cylinder The steam humidifier is available with two different types of steam cylinders: – Exchangeable steam cylinder type A... (standard version) – Cleanable steam cylinder type D... (option) The following tables present an overview of the steam cylinders used in the different models. Model Condair CP2 F5…F8 F9…F15 F16...F25 F26...F45 F46...F60 F61...F90 F91...F105 F106...
Modules M.. Overview modules M.. Module Control opportunities with humidistat On/Off M with continuous controller IQ internal external X X Module for models N4 and H4, with numerical display (for steam capacity and error codes) and integrated remote fault indication (relais contact). M3 X X X X X X X X Module for models with steam capacities above 5 kg/h, with numerical display (for steam capacity and error codes) and integrated PI-controller with fixed settings (P= 18%, I= 480 s).
– System 2: Room humidity control with continuous limitation of the supply air humidity System 2 is suited for air conditioning systems with a large porion of supply air, low supply air temperature, post-humidification, or variable airflow volume. If the supply air humidity exceeds the preset value, the continuous limitation is effected prior to the room humidity control. The humidity sensor (A1) is preferably located in the exhaust air duct or in the room itself.
Which humidity control system for which application? Application Location of the humidity sensor Room or exhaust air duct supply air duct supply air portion up to 33% System 1 System 1 supply air portion up to 66% System 1 or 2 System 2 or 3 supply air portion up to 100% System 2 System 3 ––– System 3 System 1 ––– Air conditioning systems with: Supply air humidity control Direct room humidification Please contact your Condair supplier, if your application meets the following conditions: –
4.3 Accessories 4.3.1 Accessories overview The following table presents an overview of all accessories which are available for the steam humidifier Condair CP2. N4 H4 Model Condair CP2 Steam nozzle – W21 H5...H8 F5...F8 G5...G8 F9...F15 G9...G15 F16...F45 G16...G30 F46...F60 G31...G45 F61...F90 G46...G60 – – – – – F91...F105 F106...F135 G61...G75 G76...G90 – – (details see chapter 4.3.2) number Steam distribution pipe – 1 – – – – – – – – 1 x 41-.. 1 x 41-.. 1 x 61-..
Note: If the humidification distance (see chapter 5.3.1) has to be reduced for technical reasons, the amount of steam per basic unit must be divided between two steam distribution pipes or the steam distribution system OptiSorp must be used. If this is the case, contact your Condair supplier. OptiSorp steam distribution system The OptiSorp steam distribution system is used in ventilation ducts with a short humidification distance (for the calculation of the humidification distance refer to chapter 5.3.1).
4.4 Additional planning instructions In addition to the selection of the steam humidifier, the accessories and the options, other points should be considered during planning. Please note the information in the following chapters: – Unit fitting (see chapter 5.2) – Steam installation (see chapter 5.3) – Water installation (see chapter 5.4) – Electric installation (see chapter 5.
5 Mounting and installation works 5.1 Safety instructions for mounting and installation works – All mounting and installation work must be performed only by adequately qualified personnel. Ascertaining the qualifications is the customer‘s responsibility. – All local regulations relating to the execution of the respective installation work (Water, steam and electrical installation) must be noted and complied with.
min. 400 mm Minimum distances to observe Unit B (Slave) Unit A (Master) min. 100 mm min. 600 mm min. 600 mm min. 50 mm min. 600 mm 50 mm Dimensions Housing size small medium large 346.5 mm 367 mm 274.5 mm 134 mm 170 mm 482 mm 179 mm ø45 mm 131 mm ø30 mm 285 mm ø22 mm 85 mm 184 mm 696 mm 720 mm 98 mm 455 mm 478 mm 52 mm 627 mm 651 mm 180 mm 42 mm 137 mm 79 mm 184 mm Weights N4 H4 Model Condair CP2 Housing size H5...H8 F5...F8 G5...G8 F9...F15 G9...G15 F16...F45 G16...
5.2.2 Mounting the humidifier Caution! When fixing the Condair CP2 use only the fixing materials supplied with the unit. If fixing with the materials supplied is not possible in your particular case, select a method of fixing that is of similar stability. In case of doubt, please contact your Condair supplier. b e a Measure A B f c d a b c d e f small 92.0 mm 50.0 mm 156.0 mm 212.0 mm 40.0 mm 405.0 mm Housing size medium 172.0 mm 50.0 mm 54.0 mm 190.0 mm 40.0 mm 577.0 mm large 241.0 mm 50.
5.3 Steam installation 5.3.1 Positioning and mounting of the steam distribution pipes The location for the steam distribution pipes should be determined at the time of dimensioning the air conditioning system. Please note the following instructions to ensure proper humidification of the duct air. Calculating the humidification distance The water vapor, emitting from the steam distribution pipes, requires a certain distance to be absorbed by the ambient air so that it is no longer visible as steam.
Minimum distances to be observed To prevent the water vapor, that is emitting from the steam distribution pipe, from condensing on downstream system components, a minimum distance to the steam distribution pipe must be observed (depends on the humidification distance “BN”).
In positioning the steam distribution pipes, the following dimensions should be observed.
5.3.2 Positioning and mounting of the fan unit The fan unit is mounted on the wall separately above the unit. To allow the steam coming from the fan unit to spread out evenly, without condensing on obstacles (ceilings, joists, pillars, etc.), the following minimum dimensions must be observed when selecting the location for the fan unit or units N4 with integrated fan. D D B E C A N4 with FAN FAN15 FAN45 mD max. 4 kg/h 8 kg/h 15 kg/h 30 kg/h 45 kg/h A min. 2.0 m 3.0 m 6.0 m 8.0 m 10.
5.3.3 Installing the steam hose Important! Use original Condair steam hose exclusively. Other types of steam hoses can cause undesired operational malfunctions. Instructions for the hose layout The hose layout depends on the position of the steam distribution pipe: – Steam distribution pipe is mounted more than 300 mm above the top edge of the humidifier: min. 20 % in. Rm 0 mm 30 max. 4 m min. 300 mm min. 20 % max. 4 m min. 300 mm Rm 300 in. mm min.
– Steam hoses must be prevented from sagging (condensate pockets); if necessary, support with pipe clamps, trough, or wall brackets, or install a condensate drain in the steam hose. – Important! When deciding on the length and layout of the hose, it should be noted that the steam hose may become somewhat shorter with progressive ageing. Securing the hose The steam hose must be secured to the steam distribution pipe and humidifier steam outlet by means of hose clamps.
– Steam distribution pipe is mounted less than 300 mm above the top edge of the humidifier: min. 300 mm min. 20 % 0m m 20 Øm in. Øm in. 20 0m m min. 20 % min. 300 mm Condensate hose is led down with a minimum slope of 20 %, in the form of a siphon (min. hose bend radius Ø200 mm), directly into a discharge funnel. Note: If your unit feeds a number of steam distribution pipes, the individual condensate hoses are to be led into the discharge funnel.
5.4 Water installation All work concerning the water installation must be performed only by adequately qualified personnel (e.g. plumbers). Ascertaining the qualifications is the customer‘s responsibility. Please observe all local regulations concerning the installation of appliances to the mains and waste water systems.
Water supply The water feed pipe is to be connected via the filter valve (accessory “Z261”), to the connection on the unit (see detailed illustration). The installation of the filter valve should be made as close as possible to the steam humidifier. Note: Instead of the filter valve, a shut-off valve (essential) and a water filter 5 µm (not essential, but advantageous) can be used. Warning - danger of damage! Union nut at the humidifier connection must be hand-tightened only.
5.4.2 Inspecting the water installation Use the following check list to ascertain that the installation has been performed correctly: – Water supply Has filter valve (accessory “Z261”) or shut-off valve and filter 5 µm respectively been installed in supply line? Have admissible water pressure (1.
5.5 Electric installation Separate electrical installation instructions are supplied for this purpose, giving all necessary details (connection data, diagrams, etc.) for the correct installation of the electrics. The details in the electrical installation instructions must be followed. Please also note the following safety instruction: – All work concerning the electric installation must be performed only by adequately qualified personnel (electrician or workman with equivalent training).
5.5.2 Inserting CP2-chip (models H5...H8, F... and G... only) 3 1 2 All important operating parameters such as the maximum steam capacity, the heating voltage and the number of base units are permanently stored on the CP2-chip. Before you start the electrical installation, check whether the CP2-chip is installed. If it is not, check whether the type designation on the CP2-chip supplied corresponds with the type designation on the data plate of the units).
6 Operation 6.1 Operational safety instructions – Initial commissioning: Before the steam humidifier is put into operation for the first time, all installations and the unit configuration must be inspected by the responsible persons to see that everything is correct (see also checklist for the individual installations). Any defects must be expertly dealt with before commissioning.
6.3 Commissioning In order to start up the steam humidifier, take the following steps: • Check steam humidifier and installations for damage. Warning! Damaged units or units with damaged installations must not be put into operation. • Check whether the unit covers are correctly in place and fastened. • Open the shut-off valve to the water feed. • Switch on the service switch for network supplies (heating and control voltage). • Switch on the unit switch on the steam humidifier.
– The yellow LED blinking at regular intervals shows that there is a malfunction which the control of the steam humidifier is trying to repair. The rate at which it blinks shows what sort of problem there is. In-depth details are in chapter 6.6. – The red LED blinking at regular intervals shows that there is a malfunction which the control of the steam humidifier cannot repair. The rate at which it blinks shows what sort of problem there is.
6.5 Maintenance – All maintenance work should only be carried out by trained and qualified personnel, who are familiar with the related dangers. Checking the qualification is the customer’s concern. – The instructions and details for maintenance work must be followed and upheld. – Only the maintenance work described in this documentation may be carried out. – You should only use original Condair spare parts to replace faulty parts.
6.5.2 Replacement/cleaning of steam cylinders Life time The life time of the steam cylinders and electrodes depends on various factors (water quality, conductivity, average steam output). The following apply in general: When the yellow LED lights up: – Replacement steam cylinder Type A... should be replaced. – Cleanable steam cylinder Type D... should be cleaned, as long as the maximum life time (5,000 hrs) has not yet been reached. Note: Only the cleanable steam cylinder Type D... can be cleaned.
6.5.3 Removing and installing parts Warning! Before starting to remove parts, the steam humidifier must be switched off as described in chapter 6.4 and secured against accidental switching on. Warning - danger of burning! If steam was produced until shortly before switching off, the steam cylinder will be hot. Therefore you should wear well-insulated gloves or wait until the steam cylinder is cool to remove parts. Removal and installation of the steam cylinders 1 2 4 3 1.
Installation of the steam cylinder follows the reverse sequence. Please note the following instructions: – Before installation of the steam cylinder in the unit check the O-ring in the drain valve for damage and replace if necessary. – Place steam cylinder in the holding devices on both sides of the unit or the rear respectively. Carefully push steam cylinder downwards into the drain valve until it stops.
Disassembly and assembly of the cleanable steam cylinder type D... 1 3 4 2 1. Fasten electrode snap fastenings and push electrodes approx. 2 cm downwards into the steam cylinder. 2. Release clamp clips of the cylinder cover and raise cover. 3. Remove carefully electrodes by lifting upwards. 4. Remove O-rings from the electrodes. Note: Intact O-rings can be reused. The assembly of the cleanable steam cylinder follows the reverse sequence.
Removal and installation of drain valves The steam cylinder has to be removed first, as already described, before removing the drain valve. models N4/H4 all other models 2 3 2 3 4 5 1 5 1 1. Detach electric cable. 2. Release hose clamp and detach filling hose. 3. Release two fixing screws using screwdriver and remove drain valve. 4. Unplug earth cable from drain cover and remove drain cover. 5. Disassemble drain valve. Installation of the drain valve follows the reverse sequence.
Removal and installation of the inlet valve The steam cylinder must not be removed, before removing the inlet valve. models N4/H4 all other models 2 1 2 1 3 4 4 3 1. Detach electric cable. 2. Release hose clamp and detach hose. 3. Release union nut of water supply pipe and remove. 4. Release two fixing screws using Philips screwdriver and remove inlet valve. Installation of the inlet valve follows the reverse sequence.
6.5.4 Instructions for cleaning Cleaning the steam cylinder Type D... Details on cleaning the cleanable steam cylinders Type D... can be found in the separate documentation to this unit component • Knock off any limescale as much as possible. Note: If the parts are heavily calcified, place them in an 8% formic acid solution, until the limescale disintegrates. • Then wash parts with a hand-wash temperature soap solution and rinse well.
6.6 Fault elimination Important! Most operational malfunctions are not caused by faulty equipment but rather by improper installation or disregarding of planning guidelines. Therefore, a complete fault diagnosis always involves a thorough examination of the entire system. Often, the steam hose connection has not been properly executed, or the fault lies with the humidity control system. 6.6.
– Red LED “Error” blinks intermittently The control, after several attempts, fails to solve the problem (number of attempts depends on the type of malfunction) or the problem obstructs further operation. In this case the heating voltage is interrupted via the main contactor.
Cause Remedy Ventilator interlock open. If applicable, check/turn on ventilation system. Air flow monitor activated. Check ventilator/filter. Safety humidistat activated. Wait, if applicable, check system. Water conductivity too low (after initial operation). Wait. Water conductivity too low for type of steam cylinder. Select correct steam cylinder type. Phase failure heating voltage. Check mains fuse(s) and replace if applicable. Formation of foam in steam cylinder.
Indication/Malfunction “Warning” yellow LED blinks on module M4 5x No Electrode Current [A] red LED blinks 5x Electrode current to low (less then 30 minutes) 6x Excess Current Of Electrode [A] “Error” on module M/M3 E5A 6x E6A Electrode current to high Indication on master unit Indication on slave unit or blinks permanently with drain/info key released --- BUS Line/Traffic interrupted --- No Electrode Current [A] Phase Interrupt Outlet-V Leaking Electrode current to low (more then 2 hours
Cause Remedy Phase failure heating voltage. Turn on mains service switch, Inspect main fuses and replace if applicable. GFCI activated. See “Electric-Installation Condair CP2/Module M..”. Current/peak-current cut-off. See “Electric-Installation Condair CP2/Module M..”. Water supply obstructed, water pressure too low, inlet valve defective. Open shut-off valve, clean water inlet filter, check water pressure, inspect/replace inlet valve. Drain valve is leaking. Clean/replace drain valve.
6.6.3 Instructions for fault elimination When eliminating faults, the steam humidifier must be taken out of operation (see chapter 6.4). Warning danger of death! Take care that the electricity supply to the main contactor is cut off (test with voltage tester).
7 Technical data 1) Heating voltage 230V/1N~/50…60Hz Model Condair CP2... Steam capacity in kg/h Max. power consumption in kW 3) Heating voltage 400V/3~/50…60Hz Model Condair CP2... Steam capacity in kg/h 2) Max. power consumption in kW N4 1…4 0.75...3.0 H4 1…4 0.75...3.0 1) 3) Heating voltage 230V/3~/50…60Hz Model Condair CP2... Steam capacity in kg/h 2) Max. power consumption in in kW H5...H8 5…8 3.8...6.0 F5...F8 5...8 3.8...6.0 F9...F15 9...15 6.8...11.3 F16......F45 16...45 12.0...33.