Installation Instructions
26 Mounting and installation work
Typical installation for room humidication
Fig. 8: Typical installation for room humidication
Z261
KS10
DS80
BP
BP
Humidity sensor or
humidity controller
Steam line
– As short as possible (max. length 4 m)
– Adequate upslope/downslope min.15 % (8.5°)
– No restrictions
– Condensate trap at the lowest point
– Hose or xed pipe (with same inner diameter
as steam outlet)
Blower Pack
(mounted separated from the steam humidier)
Condsensate line
– Min. downslope 15 % (8.5°)
– No restrictions
– Condensate trap ømin 200 mm
Filter valve or
Shut-off valve and lter 5µm
Water drain connector ø30 mm
Water supply connector G 3/4"
Water supply pipe
(min. inner diameter 8 mm, supplied by others)
1...10 bar / 1...40 °C
(with optional drain water
cooling 2...10 bar / 1...25 °C)
Electrical isolator heating voltage supply
(supplied by others)
ømin: 40 mm
Electrical isolator control voltage
supply (supplied by others)
Drain hose (supplied)
– internal diameter ø30 mm
– Drain hose must be led to the left
– constant downslope (min 15 %/8.5°) to funnel
– if using DI or RO water, use supplied drain hose or stainless
steel pipe only
– must not touch funnel
Open funnel with trap
(supplied by others)
High limit humidistat
(external safety chain)
to drain *
to cylinder *
* connector used with remote
blower pack mounting only
ømin : 200 mm










