Operation Manual
52 Maintenance
6.3 Maintenance list
Adjacent you can nd an overview of the maintenance work to be carried out on "Small maintenance"
and "Extended maintenance".
Components
Small
maintenance
Extended
maintenance
Work to be done
Scale collector tank X X Remove and clean.
Steam cylinder
X
Remove, disassemble and clean, replace defective
components if necessary.
Steam cylinder receptacle X Inspect, clean if necessary.
Drain pump
X
Remove, disassemble and clean, replace if nec-
essary.
Inlet valve X Remove and clean lter insert, replace if necessary.
Filling cup X Inspect, clean if necessary.
Level unit X Inspect, clean if necessary.
Drain cup X Inspect, clean if necessary.
Drain pipe and siphon X Inspect, clean if necessary (decalcify and rinse out).
Steam installation
X
Inspect steam and condensate hoses for cracks
and ensure that they are correctly attached, replace
defective hoses.
Water installation
X
Inspect water hoses in the unit for cracks and to
see that they are correctly attached, replace defec-
tive hoses.
Check supply pipe is tight, tighten it if necessary.
Clean water lter, if available.
Electrical installation
X
Have all cables in the unit checked by an electrician
that they are correctly xed and that the insulation
is not damaged