Installation Instructions

12
1-877-742-3071
www.connectadock.com
1501OwnerAvenue,Atlantic,IA50022USA
1-877-742-3071
www.connectadock.com
1501OwnerAvenue,Atlantic,IA50022USA
Instructions for:
Utility Channel (UT2048),
(UTC2048), Pedestal Lighthouse
(LH2000)
Tools Needed
9/16” (16 mm) Socket wrench
3/8” (9.5 mm) Drill Bit and Drill
Step 1
Remove lid of Utility Channel and
turn upside down.
Step 2
(a)Center metal bracket on Utility
Channel Lid. (b)Mark and drill four
corner holes all the thru the lid.
(c)Dotted line shows area that
could be cut to run utility lines to
the power pedestal. Only cut a
hole as large as needed.
Step 3
Secure Power Pedestal with cariage
bolts, up thru Utlity Channel Lid.
Tighten all bolts in the dock using
25 lbs/ft (3.46 kg/m) of torque.
Step 4
Set Lid and Pedestal on top on the
channel and Tighten all bolts in the
dock using 25 lbs/ft (3.46 kg/m) of
torque.
Before you begin: Determine the
layout and location of your utility
channel and Pedestal Lighthouse.
Note: Power Pedestal needs to
mounted between lid bolt points
and not overlapping Utility
Channel sections. NOTE: Power
Pedestal hook up instructions
included with Pedestal Lighthouse.
2
3
1
FOR SAFE INSTALLATION AND OPERATION - All utilities conduit
needs to meet all state and local utilities construction codes
4
(c)
(c)
(b)
(a)