Installation manual

PS10270JENAA01 20/10/2004 37
Chapter 1 - Before you start
For the best results with the new M6501L/R IP PBX installation, use this section to help your
preparation, before you start installing.
It contains a summary of the ideal site conditions, the inventory of the equipment to install, and a
summary of the tools required to install and set up the M6501L/R IP PBX.
Surveying the customer site
Before you begin installing the ICS, check the site to make sure the conditions needed for the
system to function properly are satisfied.
Here is a summary of considerations for the installation of the new MC 6501-C8L:
location
environment
space
electricity
Location
Unpacking, installation, operation, service, and storage
The location must be of sufficient size to house the ICS and a worktable. This table will be
used to install a telephone set, a VT100 terminal or a computer, a printer, and all the other
peripheral equipment.
Main distribution frame and batteries
Check that there is a suitable location for the MDF and batteries no more than four meters
from the ICS cabinet. The MDF cable is 5 m long. Follow the supplier's instructions
concerning location of the batteries.
Only experienced technicians should service the system
The installer must be aware of the possible electrical hazards to which they may be
exposed.
It is essential to take every precaution necessary for people's safety.