Installation manual
60 20/10/2004 PS10270JENAA01
Installing the tie line cards
Installing the analogue TL cards
• The switches on LI1 with 2- or 4-wire E&M are: CA1 for equipment 0 on the J2 connector and 
CA2 for equipment 1 on the J3 connector.
LI1 cards are installed in the following slots: 
Installing the digital TL cards
• Switch CA8 on the LT2 card sets the ISDN T2 (PRI) and PCM configuration, and switch CA4-
1 controls the clock validation.
LT2 cards are installed in the main cabinet in shelf 0 only in the following slots:
Card
Main cabinet - Shelf 0
0 1 2 3 4 5
LI1 YES YES YES YES YES YES
Card
Main cabinet - Shelf 1
0 1 2 3 4 5 6 7
LI1
YES YE
S
YES YES YES YES YES YES
Card
Expansion cabinet – Shelf 2
0 1 2 3 4 5
LI1
NO
YES YES YES YES YES
Card
Expansion cabinet – Shelf 3
0 1 2 3 4 5 6 7
LI1
NO YE
S
YES YES NO YES YES YES
Card
Main cabinet - Shelf 0
0 1 2 3 4 5
LT2
YES YES NO NO YES YES










