Lighting Design Guide

Table Of Contents
80
Lighting project checklist
2
2
3
3
4
4
1
1
Definition
Roles/Responsibilities
Initial Meeting:
Team: Client, Architect, Interior
& Lighting Designer,
General Contractor
Initial Meeting of all decision
makers and influencers
Establish working
relationships—roles and
responsibilities for each party
Determine key project
milestones
Determine decision
making process
Document the assumptions of
the project
Input Criteria:
Is the Client ready to move
ahead with Panelized or
wireless lighting from C4?
Key Deliverables:
Decision on Panelized or
wireless lighting or hybrid
Initial review of plans:
Team: Architect, Lighting
Designer, Electrician
Review luminary and bulb
selection plans by room
Focus on loads that are
0-10V, CFL or LED or have the
possibility of these in the future
Review customer’s need for
keypads and faceplate colors/
finishes
Review detailed milestones for
project and key action items
Input Criteria:
Roles and Responsibilities are
clear; sub-team has authority to
move forward
Residential/commercial site
electronic floor plans all project
elements identified: location(s),
load types, ratings, utility
rooms, etc…
Key Deliverables:
Key decision makers all
have same understanding of
the project
Provide budgetary quote for
C4 lighting solution to key
decision maker
Give C4 Reference
Design Guidelines to
electrician selected
Review revised plans:
Team: (Ideally) Architect,
Lighting Designer, Electrician
Walk decision makers through
the lighting proposal
Review load types
Finalize keypad locations
C4 dealer reviews luminary and
bulb types to the C4 approved
list of compatibility
Input Criteria:
Team members are working
together on a solution
Client conditional approval of
Budgetary quote for C4
Key Deliverables:
Ship sample luminaries
(compatibility concerns) to C4
for load testing
Initial lighting design:
Team: (Ideally) Architect,
Lighting Designer, Electrician
C4 dealer creates initial lighting
project design and reports
OPTIONAL: Submit project to
C4 Lighting Design Service
C4 Dealer and Electrician walk
property with design and clarify
implementation
Team determines preliminary
list of lighting scenes per
room/floor
Input Criteria:
Feedback from C4 on load
characterization
Cost estimate including C4
gear, C4 dealer labor and
electrician costs
Key Deliverables:
Parties have an on what needs
to be done and that all costs
are covered between the
team members
Revise the C4 lighting cost
estimate in a detailed quotation
Checklists completed for each
activity above
Final lighting design:
Team: Client, Architect, Interior
& Lighting Designer, Electrician
Review implementation
Lighting solutions including:
load schedule, keypad color/
finish, keycaps and lighting
scenes, keypad engraving
report, etc…
C4 dealer reviews all costs and
charges anticipated
Client change order form (COF)
presented to Client
A COF will be used anytime the
client, interior, and/or lighting
designer which impacts the
approved Lighting design
Input Criteria:
Final lighting design from
the Team
Key Deliverables:
Team approval documents
Approvals from the Team t
o
move forward with the lighting
design and cost estimate
Client pre-payment for services
and products
C4 dealer orders the panelized
cabinet(s) & terminal blocks
C4 dealer presents client with
keypad engraving report for
their approval
Review Project Scope Project Planning Project Design Project Approval
Planning Design
Client
Approval