Instruction manual
8. Re-attach the door bracket using your reference marks as a guide and tighten the bolts. Ensure that the slots in
the mounting bracket of the opener align with the slots in the door bracket - the door bracket may have to be
relocated.
Note: If the bracket cannot be relocated, the opener may be fitted onto the axle as follows:
• For Series 1 style doors - you will need to use two Series 1 style, 5/16” U bolts and saddles (one set supplied) to
attach the operator to the axle, or
• For Series 2 style doors - you will need to use the Series 2 style, 3/8” U bolt and cast saddle (not supplied) to
attach the operator to the axle.
9. Using your reference marks as a guide:
• For Series 1 style doors - fit the new U bolt and saddle with the 2 nuts supplied and tighten firmly, or
• For Series 2 style doors - reuse the existing bolt and saddle arrangement. Note: the Series 2 style cast saddle
will need to have 1mm ground off both sides to fit into the operator mounting bracket.
10. Adjust the door position (if necessary) on the brackets so that the door feeds smoothly into the guides. Make
sure that the center of the door doesn’t hit the lintel and that the curtain is not pushed forward hard into the guide.
11. Remove the support and safety ropes.
If the manual release is more than 1.8 metres from floor level when the opener is
installed, extend the manual release handle to a height less than 1.8 metres.
12. Connect the power cord to a suitable power point - do not switch on. Secure the cord away from any moving
object (e.g. the door roll) with the cable clip supplied.
13. Pull the door up and down to make sure it runs freely - make sure the ring gear is still disengaged.
Step 5: PROGRAM THE OPENER
The opener needs to have the dipswitches, force settings, door travel limits and remote control transmitter codes
programmed before it is fully operational. The following method of programming is recommended. Remove the 2
screws retaining the light cover, the light cover can hang on the disengagement handle. (the screws are captive and
should remain in the light cover).
Step 6: Setting DipSwitches.
There are 4 dipswitches located at the base of the opener that need to be set before power is turned on,
as follows:
Page 10 ©Copyright 2001
B&D Australia
54321
S1
S2
AS3350
S
S