Instructions / Assembly

6
Ventamatic, Ltd. | 100 Washington Ave, Mineral Wells, TX 76068 ▪ Phone: (800) 433-1626 ▪ www.bvc.com
Step 6 (Attic):
Extend the duct and duct transition down to the damper assembly box.
Fit the duct transition over the top of the damper assembly box. Ensure that it sits flush against the top of the
damper assembly box as shown in Figure E.
Use the provided foil tape to seal the seam between the duct transition and damper assembly box to prevent air
leakage when the unit is running.
D