Instructions / Assembly

QUICK START WIRELESS CONTROL MODELS
1. Determine Location
Find a location in a center hallway or similar area and mark the
center of the ceiling with a pencil. Drill a hole through the ceiling
and push a marker through so it can be located in the attic.
2. Prepare Shutter Opening
Find the joist closest to the hole and mark out an area equal to the
size of the inner edges of the shutter with the joist in the center.
Remove all insulation from the area before cutting. (Figure 1)
3. Cut the Shutter Opening
Use a circular saw or saber saw to cut along the marked area of the
ceiling then carefully remove the drywall from the opening.
(Figure 2)
4. Frame and Facing
Use lumber of the same dimensions as your joists and fasten them
to the edges of the frame opening using #12D nails to create a
complete square frame then replace the insulation around the
frame. (Figure 3) Then use 2 X 6 boards to create a square rest
with the inside dimensions being the same as the opening. (Figure
4)
5. Installing the Fan
Assemble the fan properly, as pieces were moved to protect them
during shipping, and take it up to the attic. Place the fan on top of
the facing and nail it in. (Figure 5)
6. Installing the Shutter
Draw alignment marks 7/8” away from the edges then install the
shutter with the white-headed wood screws provided with the fan.
(Figure 6)
7. Wiring Instructions
After disconnecting the power supply attach the wires as shown.
(Figure 7)
8. Hub Pairing Instructions
Download the Wi-Fan app available at your smart device store and
follow the in-app instructions to begin the pairing process.
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Tools and Materials Needed
Drill 1/4” and 1/8” drill bits • Straight edge ruler
Pencil or marker • Circular saw 1 1/2ring shank drywall nails
#12D nails • Adjustable wrench • Flat head screwdriver
Philips head screwdriver • Safety goggles • Saber saw
Speed square
WRD INS QUICK HUB © 2017 Rev. 4/10
Figure 7

Summary of content (1 pages)