Unit installation

42
INSTALLATION INSPECTION
It is the responsibility of contractor or owner to verify and ensure that the following essential requirements are
complied:
Unit installed on flat concrete base and meets the specified clearances.
Vibration isolators are installed properly.
Ensure that all valves including balancing valves, globe valves, stop valves, motorized valves, drain
& air vent connections and flow meters are installed as per the requirement.
Temperature and pressure gauges provided at inlet and outlet piping of the cooler.
Ensure that all temperature and pressures gauges provided on the system are duly calibrated.
Strainer is installed on chilled water inlet to the unit.
Water flow switch is provided and at its correct location.
Field wiring is complete and all sensors and switches interlocked with the controller.
All optional sensors, gauges, valves etc. if any are installed and connected to the controller.
Ensure that chilled water pump is interlocked with the controller.
Chilled water pumps are suitable to handle the required flow rate, head etc.
All wiring connections are tight.
Unit control panels have the proper schematic diagrams.
Ensure compressor-mounting retainer brackets are removed and adjust the bolts.
Ensure that all condenser fans motor propellers are tightened.
Flexible connections provided at interconnection with chilled water piping and power cable entry.
Chilled water lines to the cooler are insulated.
Check for proper grounding of the chiller.