Unit installation

APPENDIX
Page 4 of 4
LOCATION CR1 CR2 CR3 CR4 CR5 CR6 CR7 CR8
1. Discharge line at compressor
2. Suction line at compressor
3. Saturation temperature corresponding to suction pressure
4. Suction superheat (2 minus 3)
5. Liquid line entering sub-cooler (economizer)
6. Liquid line leaving sub-cooler (economizer)
7. Saturation temperature corresponding to discharge pressure
8. Liquid line leaving condenser
9. Condenser subcooling (7 minus 8)
10.Condenser air on
11.Condenser air off
12.Chilled water/ brine/ glycol in
13.Chilled water/ brine/ glycol out
14.Ambient temperature
NOTE : Be sure that all the thermometers or thermocouples are strapped tightly to lines and insulated for accurate readings.
LOCATION CR1 CR2 CR3 CR4 CR5 CR6 CR7 CR8
Discharge pressure
Suction pressure
Net oil pressure
Liquid line pressure at pump down solenoid valve
Liguid line entering sub-cooler (economizer)
Oil level #1 #2 #3 #4 #5 #6 #7 #8
(Compressor sight glass)
Oil color #1__________#2________#3_________#4__________#5___________#6_______________________
_
#7______________
_
#8______________
_
A
cid test #1__________#2________#3_________#4__________#5___________#6________________________
_
#7______________
_
#8______________
_
Field service engineer___________________________________________________________________________________________
_
Contractor Name_______________________________________________________________________________________________
_
A
ddress______________________________________________________________________________________________________
_
This report filled out by ______________________________________________
_
Date_______________________________________
_
JOB SITE DISCREPANCIES - OWNER/ CONTRACTOR RESPONSIBILITY : Signature :___________________________
_
________________________________________________________________________
_
Title :_______________________________
_
________________________________________________________________________
_
Date :_______________________________
_
We, the undersigned, agree that this start - up meets with our approval pertaining to the performance of the equipment and to the
training received by our operating and service personnel.
TEMPERATURE READINGS
PURCHASE ACCEPTANCE OF ZAMIL START UP
PRESSURE READINGS
This check out report is to be completely filled out and sent to Chiller Engineering Manager, Zamil Airconditioners, P.O. Box 14440,
Dammam 31424, Saudi Arabia.
69