Data Sheet
 PRODUCT SPECIFICATION 
Product  Alkaline battery; 1.5Volts  Page  3 of 3 
Size  IEC LR6 
  13. Safety test (Test environment: 20℃±2,60%±15%R.H) 
Test item  Test method  Test pcs  Requirements 
Over-discharge 
leakage test 
10ohms (24h/d) 48hours  9pcs  No leakage 
3.9ohms (4min/h,8h/d) to 0.6V  9pcs  No leakage 
1000mA (10s/min, 1h/d) to 0.6V  9pcs  No leakage 
10ohms (1h/d) to 0.6V  9pcs  No leakage 
43ohms (4h/d) to 0.6V  9pcs  No leakage 
24ohms (15s/mn, 8h/d) to 0.6V  9pcs  No leakage 
High temperature 
test 
60±2℃,RH:90±5%, after 20 days storage, the cells 
shall be stored in an ambient temperature of 20±
2℃,RH:60±5%, for 4-24hours. 
40  No leakage 
One piece of battery 
Short circuit test 
The terminal of an un-discharged battery is connected by wire. 
The circuit is completely for 24hours or until 
the case 
temperature has return to environment. 
10  No explosion 
Reversible charge 
4 pieces of battery 
are in series connected and one of them is 
under incorrect polarity for 24 hours or until 
the case 
temperature has return to environment.. 
40  No explosion 
Over discharge 
One battery discharge 43ohms to 0.6V, then in series connect 
with 3 pieces of new battery with 20ohm 24h  
36  No explosion 
Free fall test 
The battery free drops from one-
meter height for 6 times, then 
store for 1h 
10  No explosion 
Impact under high 
and low temperature 
Un-discharged battery store in test box under 70±2℃  for 
24h,then change to -20℃  for 24h, repeat the above condition 
for 10 cycles. 
20  No explosion 
Storage after partial 
discharge 
50% discharged battery stored under 45±5℃  for 30days  9 
No leakage 
No explosion 
14.Expiry period: 7 years 
15. Expiry period marking: 
① Expiry date marked on the bottom plate of finished battery . For example: 08-2020 means 
the production date is August 2013. 
②For private label, can mark according to customer’s requirement 




