Installation manual
Viper Installation Manual
© 2008-2009, IMI Cornelius Inc. - 23 - Publication Number: 621260373INS
Pressurizing the Water System
Perform the procedure in Table 13 to verify the water connection to the unit.
Figure 17
NOTE:Remove the valve cover to access syrup and water valves.
Table 13
Step Action
1 Turn on the water supply to the unit.
2 Check the system for leaks.
3 The Do Not Drink and Out of Product lights remain on. NOTE: The H2O
Out error does not clear until CO2 pressure is applied.
4 Turn the product supply valve to the down (BRIX) position and open the
valve at the end of the sample tube.
5 Place the end of the tube in a bucket.
6 Manually lift the water valve at the front of the unit (Figure 17) to fill the
water system.
7 When water flows from the sample tube, the system is full and you may
proceed to Table 11 and pressurize the CO2 system.
8 Repeat Steps 4 through 7 for each barrel in the unit.
Manual
Water
Valve
Manual
Syrup
Valve
(push up to open)
(push up to open)