Service manual
Quest Installation and Service Manual
Revision B - 10 - 720506904
Check and Top-Off Water Ice Bath:
1. Remove the drip tray and lower splash panel.
2. If the Ice bath level is below the “Full” indicator, top it off with water. Refer to the Filling the Ice
Bath procedure in the Installation section of this manual.
ANNUALLY
Replace Pump Tubing:
A replacement pump tubing kit,
part#45098, is available. The kit con-
sists of one pre-cut length of pump
tubing, two white plastic hose clamps,
and instructions.
Removing Pump Platform(s):
1. Remove the concentrate contain-
ers from the dispenser and place
them in a refrigerator.
2. Remove the cabinet shelf that the
concentrate containers sit on.
3. Flush the system prior to remov-
ing the pump platform (refer to the
Daily section located at the begin-
ning of the Planned Maintenance
Schedule). Remove the dispense
nozzles and static mixers.
4. Unplug the water line quick dis-
connect by pressing the gray but-
ton (see Fig. 1&2).
5. Slide the locking latch forward. Lift
the platform slightly and pull for-
ward to gain access to the electri-
cal connector (see Fig.1).
6. Unplug the electrical connector by
squeezing the locking tabs on ei-
ther side and pulling out the con-
nector. Lift and remove the pump
platform (see Fig.1).
Replacing Pump Tubing:
1. Remove pump platform (refer to the Removing Pump Platform(s) pro-
cedure located earlier in this section).
2. Remove the two white plastic hose clamps from the pump tube con-
nections (see Fig. 1&2). Remove the concentrate delivery tubes from
the hose ends.
3. Loosen and remove the four thumb screws from the pump body.
4. Remove the rear pump body half only to reveal the pump tube and roll-
ers.
Fig.1
Fig.2
Bottle Adapter
(Juice Inlet)
Concentrate Delivery
Tubes
Water Inlet
Quick Connector
Hose Clamp
Thumb
Screws
Mixing
Chamber
Locking
Latch
Brix
Adjustment
Screws
Dispense/Flush
Lever
Water
Manifold
Pump
Motor
Water
Solenoid
Front & Rear
Pump Halves