User's Manual
Table Of Contents
- 1 Introduction
- 2 Unit Descriptions
- 3 Installation Guidelines
- 3.1 General System Specifications and Requirements
- 3.2 Infrastructure Preparation
- 3.3 Antenna Specifications and Guidelines
- 4 IHU Installation
- 4.1 General Installation Information
- 4.2 IHU Installation
- 4.3 Grounding Chassis
- 4.4 RF Connections
- 4.5 IHU Fiber Connections
- 4.6 Management Connections
- 4.7 Power Connections and Power Up
- 4.8 Verifying Normal Operation
- 5 PSU6 Installation
- 6 MRU Installation
- 7 Appendix A: Specifications
- 8 Appendix B: Ordering Information
Corning Optical Communications User Manual I CMA-490-AEN I Page 74
6.2.3 MRU Installation in Cabinet
1. Carefully lay cabinet on backside (so door faces upwards) and open door.
ATTENTION! Make sure that the door hatch locks into the door rail in order to avoid closing of door while installing the
chassis. See
Figure 6-14.
Note: Push hatch inwards towards the door to release and close the cabinet.
Figure 6-14. Opening Cabinet Door and Locking in Place