User's Manual
Table Of Contents
- 1 Introduction
- 2 Unit Descriptions
- 3 Installation Guidelines
- 3.1 General System Specifications and Requirements
- 3.2 Infrastructure Preparation
- 3.3 Antenna Specifications and Guidelines
- 4 IHU Installation
- 4.1 General Installation Information
- 4.2 IHU Installation
- 4.3 Grounding Chassis
- 4.4 RF Connections
- 4.5 IHU Fiber Connections
- 4.6 Management Connections
- 4.7 Power Connections and Power Up
- 4.8 Verifying Normal Operation
- 5 PSU6 Installation
- 6 MRU Installation
- 7 Appendix A: Specifications
- 8 Appendix B: Ordering Information
Corning Optical Communications DRAFT User Manual I CMA-XXX-AEN I Page 39
Figure 4-2. Overview of ERFC Cable Connection to RIX and OIX Modules
3. Route connected cables and lock tray.
Note: The tray pin must first be pulled towards the left and then
released into the hole.
Figure 4-3. Routing Connection Cables
Example of Routed Cables and Locked Tray
Figure 4-4. Example of Routed Connection Cables and
Locked Tray