User's Manual
Table Of Contents
- 1 Introduction
- 2 Unit Descriptions
- 3 Installation Guidelines
- 3.1 General System Specifications and Requirements
- 3.2 Infrastructure Preparation
- 3.3 Antenna Specifications and Guidelines
- 4 IHU Installation
- 4.1 General Installation Information
- 4.2 IHU Installation
- 4.3 Grounding Chassis
- 4.4 RF Connections
- 4.5 IHU Fiber Connections
- 4.6 Management Connections
- 4.7 Power Connections and Power Up
- 4.8 Verifying Normal Operation
- 5 PSU6 Installation
- 6 MRU Installation
- 7 Appendix A: Specifications
- 8 Appendix B: Ordering Information
Corning Optical Communications DRAFT User Manual I CMA-XXX-AEN I Page 40
4.2.4 Assembling the Door Sleeve
Assemble the Door Sleeve as follows:
1. Pull down door cover.
Figure 4-5. Pulling Down Door Cover
2. Attach door to IHU chassis
Figure 4-6.Attaching Door to Chassis
Figure 4-7 and Figure 4-8 show open and closed views of the tray with assembled door sleeve.
Figure 4-7. Open View of IHU with Assembled Door
Figure 4-8. Closed View of IHU with Assembled Door