User's Manual

Table Of Contents
Installation Digital Coverage Elements P/N 709C011801 Page 147
Draft
6.1.6 Connecting Fiber
1. Verify the fiber type:
If LC/APC (Green), use an LC-APC to UPC adapter
If LC/UPC (Blue), no adapter is needed
2. Connect the corresponding SFP module connectors (i.e. Tx/Rx port 1 corresponds to fiber port 1) to the GEM LC/APC fiber
connector. See Figure 7-3.
Figure 6-3. CEM to GEM Fiber Connections
6.1.7 Power Up
1. Make sure the power switch is off.
2. Connect supplied 110-240 VAC power cable to the power connector located at the rear of the unit. See Figure 7-4.
3. Switch power on.
Figure 6-4. CEM Power Connector
6.1.8 Verifying Normal Operation Status
Referring to the CEM LED description in section 3.2.1, verify F/O, ETH and PWR LED status on CEM module.