User's Manual
Table Of Contents
- Preface Material
- Policy for Warrantee and Repair
- Safety Instructions
- Warnings and Admonishments
- Standards and Certification
- About this Guide and Other Relevant Documentation
- Table of Contents
- 1 Introduction to GX System
- 2 System Installation
- 3 Commissioning MA Head-End
- 4 Provisioning the MobileAccessGX
- Appendix A: System Specifications
- Appendix B: Ordering Information
- Appendix C: Site Preparation
MobileAccessGX Installation and Configuration Guide 17
Figure 2-10. GX Grounding Connection
2.5.2 F/O Connections
Connect the GX SC/APC optical fiber optic port to one pair of OCH front panel UL and DL SC/APC
fiber optic ports via the F/O patch panel.
Figure 2-11. GX to OCH F/O Connections
Grounding connector
Supplied Grounding
Wire to rack or
building EARTH
Recommended
Drip-Loop