User's Manual

Connections MobileAccess™ 1000/1200
14 UM-1000, Revision 2.2
Chapter 3. Connections
3.1 Rack Installation
It is recommended to install the following MobileAccess system modules in a 19”
rack (usually in the communication room):
RIU 3U
BU 1U
MobileAccess 410/430 controller 1U
Fiber Optic patch panel and splice tray
Power supply/supplies (MobileAccess – 3U for each unit, units from other
manufacturers may vary in size)
Verify that the rack height can support all the units to be installed, where you may
also want to consider future expansions.
The following image describes shows the recommended locations of the
MobileAccess elements in the rack in order to facilitate and simplify the cabling
connections. Note that the MobileAccess 410/430 controller is at eye level to
provide an easy view of the LED indicators and LCD display and easy access to the
local and remote monitoring connections.
Figure 3-1: Recommended Order In Rack
MobileAccess Controller (1U)
MobileAccess RIU (3U)
MobileAccess
Power Supply (3U)
Fiber Optic Patch Panel
and Tray (variable size)
At eye level
MobileAccess Base Unit 6 (1U)
MobileAccess Base Unit 1 (1U)
MobileAccess Base Unit 2 (1U)