User's Manual

User Manual v1.0
UM - Everon 6000 DAS - 1-MAR-2021 - clear of comments| March 2021 |Page 43 of 174
¾ To install the HEU, follow these steps:
1. Verify box contents, see 2.3.1
2. Mount the chassis, see 2.3.2
3. Insert the modules into the chassis, see 2.3.3
4. Connect the cables, see 2.3.4
5. Power On, see 2.3.5
6. Verify normal operation, see 2.3.6
2.3.1 Verify Box Contents
1. Open the package and verify all elements are available according to the following table.
Notes:
* for details refer to APPENDIX B: Ordering information
*see an example of package unpacking underneeth the table
Table 4: HEU Package Items List
Item
Quantity
Image
HARDWARE provided in the box
Headend Unit Chassis (with blank
panels on RIM and one PSM slots) –
includes factory installed Fan
Module (FAM) in chassis rear
1
FAM Fan Module (FAM) – single
unit hosting 4 fans
(factory installed in chassis rear)
1
RJ45/RJ45 communication cable
L=2m
-2.15m (P/N 705900003)
HCM management cable
1
RIM kit:
Radio Interface Module (service
specific)
Note: the modules should be
plugged
-in instead of the blank
panel
1-12
(according
to order)