Installation Manual

Installation Manual
|
CMA-794-AEN
|
Page 5
PREPARATION
UNPACKING AND INSPECTION
Unpack and inspect the packages as follows:
1. Open the shipping packages carefully for each unit from the protective packing sponge.
2. Ensure that all equipment and accessories have been delivered.
3. Ensure that all equipment and accessories have no damage. If there is any damage, contact
your Corning service agent.
4. Antenna gain should not exceed 3 dBi.
TOOLS
Electric drill, crosshead screwdriver, side cutters, ladder, and other tools are needed for E62-
N2RU installation which is not currently offered from Corning. Customers are to provide these
tools themselves.
SYSTEM CABLING
Here are the key features of Everon™ 6200 E62-N2RU system cabling
Master A2 connects EU-O using single-port bidirectional SFP module.
EU-O connects E62-N2RU using dual-ports SFP module.
See Section Optical Transceiver Module for SFP module connection.
E62-N2RU is a DC power supply equipment.
Hybrid cable is recommend for E62-N2RU cabling. The following figure shows how hybrid
cable connects.
Philips
Screwdriver M6
and M3
Drilling Machine Pen Allen Wrench T5 Combination
Spanner 17mm