Specifications
bottoms are facing each other. Always visually inspect bungee to insure that
the locking ball is securely in the locking claw (see illustration). WARNING!
Avoid personal injury or property damage caused by flying objects.
Remove any items from flight clips when trailering boat.
Folding Instructions for Optional Flight Control Tower
In order to fold the Flight Control Tower forward, grasp the knobs found under
the support structure on the port and starboard sides of the tower. Unscrew the
threaded bolts. Rock the tower forward. The tower will rest on the grab rails
of the bow section of the boat. In the folded position, it is also recommended
that the tower be securely strapped to the grab rails. In order to reposition the
tower in the upright position, simply reverse the steps.
Optional Launch Control System
Your boat may be equipped with a water
ballast system that enhances the wake shape
for wakeboarding. This system may be in
two configurations. The system may be two
tanks located in the stern storage
compartments or it could also include a third
tank located in the storage locker by the
driver’s seat.
To fill the ballast system, launch the boat,
open the seacocks as displayed on the label, and turn on the fill pumps with the
‘FILL’ switch located on the starboard keypad. The seacocks are located
adjacent to the v-drive unit. These valves are accessed by raising the center
stern seat. Each valve has a remote operation handle located in the carpeted
panel behind the seat. The seacock for the center ballast tank, if so equipped,
is located just behind the tank and is accessed by raising the locker door
adjacent to the driver’s seat. The tanks will fill either with the boat moving
forward or at rest. Note: It may be necessary to prime the system. This can
be done by turning the pumps on and off several times or by putting the boat
in forward motion for a short time. This procedure should only be necessary
during your initial startup for the day. When the tanks are full, gauges located
on either the instrument pod or drivers console, will read “full” and water will
come out of the vent through-hull fittings located on either side of the boat.
Turn off the pumps and close the seacocks.
To empty the tanks turn on the drain pumps with the ‘EMPTY’ switch located
on the starboard keypad. When the tanks are empty turn the pumps off. There
are no valves to open or close and the tanks can be emptied when the boat is
in motion.
Winterization of Optional Launch Control System
In order to winterize the Launch Control System, take the following steps:
1.15
Launch Control Seacocks
bottoms are facing each other. Always visually inspect bungee to insure that
the locking ball is securely in the locking claw (see illustration). WARNING!
Avoid personal injury or property damage caused by flying objects.
Remove any items from flight clips when trailering boat.
Folding Instructions for Optional Flight Control Tower
In order to fold the Flight Control Tower forward, grasp the knobs found under
the support structure on the port and starboard sides of the tower. Unscrew the
threaded bolts. Rock the tower forward. The tower will rest on the grab rails
of the bow section of the boat. In the folded position, it is also recommended
that the tower be securely strapped to the grab rails. In order to reposition the
tower in the upright position, simply reverse the steps.
Optional Launch Control System
Your boat may be equipped with a water
ballast system that enhances the wake shape
for wakeboarding. This system may be in
two configurations. The system may be two
tanks located in the stern storage
compartments or it could also include a third
tank located in the storage locker by the
driver’s seat.
To fill the ballast system, launch the boat,
open the seacocks as displayed on the label, and turn on the fill pumps with the
‘FILL’ switch located on the starboard keypad. The seacocks are located
adjacent to the v-drive unit. These valves are accessed by raising the center
stern seat. Each valve has a remote operation handle located in the carpeted
panel behind the seat. The seacock for the center ballast tank, if so equipped,
is located just behind the tank and is accessed by raising the locker door
adjacent to the driver’s seat. The tanks will fill either with the boat moving
forward or at rest. Note: It may be necessary to prime the system. This can
be done by turning the pumps on and off several times or by putting the boat
in forward motion for a short time. This procedure should only be necessary
during your initial startup for the day. When the tanks are full, gauges located
on either the instrument pod or drivers console, will read “full” and water will
come out of the vent through-hull fittings located on either side of the boat.
Turn off the pumps and close the seacocks.
To empty the tanks turn on the drain pumps with the ‘EMPTY’ switch located
on the starboard keypad. When the tanks are empty turn the pumps off. There
are no valves to open or close and the tanks can be emptied when the boat is
in motion.
Winterization of Optional Launch Control System
In order to winterize the Launch Control System, take the following steps:
1.15
Launch Control Seacocks