CLEANING AND MAINTENANCE ise s common neutral detergent and a direct wale jet for proper cleaning of the wiseacre. For s mots Intense cleaning be sure o use 8 brush or broom with soft nylon bristles. o Ba sure they the existing concrete bed was Installed correctly with proper expansion joints, and with 2 slope of at least ¥% away from buildings or foundations. o Use only highly deform able cement-based premium adhesives.
EXCAVATION When digging make sirs to dig o depth they will include the entice base. The depth of the base will be determined by preexisting soil and climates conditions In your ares. H Most normal soils will require & total depth of §7 BOIL COMPACTION Compact the doll ensuring numinous of 2% slope away from buildings and foundations. This will increase the load baaing strength of the doll, and minimize movement dus to freeing or thawing and other seasonal changes.
EDGE RESTRAINT install edge restraints according to project specifications, and the Indications of the restraint producer. This will help reduce horizontals! creeping, snd the loss peer base st the edges of the installation. Edge restraints should be tall enough to contain pacer base material and pacers, but not higher than the Installation {1 The sedge restrain wiki be installed on top of the landscape fabric and will be Instrumentalist In containing the pacer ase material snd the pacers.