Installation Guide

SAND INSTALLATION GUIDE
Cover the top of the prepared sub-base
with landscaping fabric. Be sure to follow
the specic instructions of the landscape
fabric producer. Landscaping fabric will
increase the stability and the longevity of
the installation.
Lay 1” thick pipe (screed rails) parallel every couple of feet. Fill with 1” of paver base
material. Pass a at board over the screed rails to level out paver base, ensuring a slope of
at least 2% away from any buildings or foundations. Remove screed rails and ll gaps with
paver base material, and smooth the newly lled in gaps.
Select size and color of the pavers and place them gently on the prepared surface. Complete
the laying scheme according to the project specications or to your preferences.
To achieve a more natural look randomly select pavers from dierent boxes.
This will maximize the eect of shade variation on the installed surface.
Always leave a joint between the slabs of at least 3/16” inch, while using proper plastic
spacers. This will avoid porcelain to porcelain contact, and ensure proper joint lines and
joint width.
PREPARATION OF SETTING BED
INSTALLATION OF SLABS