Installation Manual
6 
Backsplash with screws  Anti-tip bracket with screws  Anti-tip wall anchor hooks with 
screws (F965 only) 
Gas pressure regulator  Gas pipe adapter with washers  Power cord with strain relief 
(Pre-installed for F965NF) 
INSTALLATION REQUIREMENTS 
TOOLS AND PARTS 
Gather the required tools and parts before starting installation. Read and 
follow the instructions provided with any tools listed here. 
Tools Needed 
Parts Supplied 
• Tape measure
• Flat-blade screwdriver
• Phillips screwdriver
• Level
• Drill
• Wrench or pliers
• Pipe wrench
• 15/16" (2.4 cm) combination
wrench
• 1/8" (3.2 mm) drill bit (for wood
floors)
• Pipe-joint compound resistant to
Propane gas
• Marker or pencil
• 3/16" (4.8 mm) carbide-tipped
masonry drill bit (for
concrete/ceramic floors)
• Noncorrosive leak-detection
solution
For Propane/Natural Gas 
Conversions 
• 1/2" (1.3 cm) combination wrench
• 1/4" (6 mm) nut drive
• 9/32" (7 mm) nut drive
• Masking tape










