Technical data

Chapter 3 Installation
6
Chapter 3 Installation
3.1 Basic requirements
The protection level of CPS SC100KT-O/US-480
photovoltaic inverter is NEMA3R (IP44). Please keep the
equipment from direct sunlight exposure if it is installed
outdoors.
9 Check and make sure that the ambient temperature
of the installation environment is 25 °C ~+60°C;
9 Make sure that the public power grid voltage is
422528Vac and the grid frequency is 57.0~60.5Hz;
9 Permission of grid connection has been granted by
the local electric power authority;
9 Installation personnel must be qualified electricians
or people who have received professional training;
9 Sufficient convection space;
9 Away from flammable and explosive substances
3.2 Checklist of installation tools
The checklist of tools for installation of the product:
Table 3-1
No. Name Specification Function
1 Wabbler screwdriver T25
For screws on the
backboard
2
Cross-shaped
screwdriver
2# For M3 and M4 screws
3 Open end wrench 14mm For M8 screws
4 Open end wrench 17mm For M10 screws
5 Straight screwdriver 2#
For screws on dry
contact
6 Sleeve 7mm For M4 nuts
7 Torque wrench / For M10 screws