Owner`s manual
INSTALLATION STEP 2
Install the Header Bracket
You can attach the header bracket either to the wail
above the garage door, or to the ceiling. Follow the
instructions which will work best for your particular
requirements. Do not install the header bracket
over drywall, If installing into masonry, use
concrete anchors (not provided),
WALL HEADER BRACKET INSTALLATION
• Center the bracket on the vertical centerline with
the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the
ceiling).
• Mark the vertical set of bracket holes (do not use
the holes designated for ceiling mount). Drill 3/16"
pilot holes and fasten the bracket securely to a
structural support with the hardware provided.
HARDWARE SHOWN ACTUAL SIZE
I I I J E I J
Lag Screw
5/16"-9xl -5/8"
Wall Mounting Holes
7/
fY,_
Optional
Wall Mounting Holes
Header
- Wall
2x4
Structural
Support
The nail hole is for
positioning only.
You must use lag screws
to mount the header bracke
Vertical
Centerline
of Garage Door
Lag Screws
5/16"-9xl -5/8"
Spring
Horizontal
Line ----/ /
/
t
/
/
/ I - Door -
Highest Point of Vertical
Garage Door Travel Centerline
of Garage Door
CEILING HEADER BRACKET INSTALLATION
• Extend the vertical centerline onto the ceiling as
shown.
• Center the bracket on the vertical mark, no more
than 6" (15 cm) from the wall. Make sure the arrow
is pointing toward the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal.
• Mark the side holes. Drill 3/16" pilot holes and
fasten bracket securely to a structural support with
the hardware provided.
Ceiling Mounting Holes
_ __//- t t / _ _ _ FinishedverticalCeiling-
/ / _ _ _/Header Centerline
Bracket of Garage Door
6" (15 cm)
Door
Lag Screws
5/16"-9xl -5/8"
The nail hole is for
positioning only.
You must use lag screws
to mount the header bracket.
of Garage Door
Header Wall
13