Manual

Installation Step 5
Hang the Opener
Two representative installations are shown.
Yours may be different. Hanging brackets should
be angled, Figure -1, to provide rigidsupport. On
finished ceilings, Figure 2, attach a sturdy metal
bracket to structural supports in ceiling before
installing the opener. The bracket and fastening
hardware are not provided. See accessory page 34.
Measure the distance from each side of the opener
to the structural support.
Cut both pieces of the hanging bracket to required
lengths.
Drill 3/16" pilot holes in the structural supports.
Attach one end of each bracket to a supportwith
5/16"-18xl-5/8" lag screws.
Fasten the opener to the hanging brackets with
5/16"-18x7/8" hex screws, lock washers and nuts.
Check to make sure the rail is centered over the
door (or in line with the header bracket if the
bracket is not centered above the door).
Remove the 2x4. Operate the door manually. If the
door hits the rail, raise the header bracket.
Grease the top and underside of the rail
surface where the trolley slides. A tube of
grease is supplied.
Hardware Shown Actual Size
5/1 6"-9x1-5/8"
Hex Screw
5/16"- 18x7/8"
©©
Nut 5/16"- 18 LOCI<Washer 5/1 6"
Figure I
5/16"-18x7/8" S_ew
5/16" Lock Washer
5/16"-18 Nut
Figure 2
(Not Provided)
Bracket 5/16"-18x7/8" Screw
(Not Provided) _"Lock Wast;er
"'_ 5/16%18 Nut
5/16".tSx718" Screw
5/16" Lock Washer
5/16"-18 Nut
15